|
CABEDELO
PORT
Main port restrictions:
Draft |
Maximum draft |
Minimum high tide demanded |
9.14 m |
1.6 m |
8.83 m |
Any high tide |
Max BEAM |
No restrictions |
Max LOA |
No restrictions |
DWT |
No restrictions |
Remark: For vessels at
draft over than 8,23m daylight is demanded for entering maneuvers.
Berth 101 (Public)
Cargo handling |
oil
products (gas oil and gasoline)
alcohols (anhydrous and hydrated ethanol) |
Max arrival draft |
9,14 m
(see Cabedelo port restrictions) |
Max air draft |
No restrictions |
Max BEAM |
No restrictions |
Max LOA |
No restrictions |
Max DWT |
No restrictions |
Nr. of Terminals |
3 |
Nr of berth |
1 |
The terminals are Petrobras, Tecab and IAT which
details as follow:
Petrobras
Storage Capacity: 10,700 CBM
Main operations
Discharging and
loading of oil products (gas oil and gasoline).
Loading
and discharging rates
From 300CBM up to 900 CBM per hour
Tecab
Storage Capacity: 21,000 CBM
Main operations
Discharging and loading of oil products (gas oil and gasoline)
Loading of alcohols (anhydrous and hydrated ethanol)
Loading and discharging rates
From 250CBM up to 600CBM per hour
IAT
Storage Capacity: 5,000 CBM
Main operations
Loading of alcohols (anhydrous and hydrous ethanol)
Loading and discharging rates
From 300 CBM up to 600 CBM per hour
Piers 103, 105 and 107
Cargo handling |
Wheat, petcoke and steel coils discharging,
clinker, bagged and
bulk cement loading |
Max draft |
9,14 m
(see Cabedelo port restrictions) |
Max air draft |
No restrictions |
Max BEAM |
No restrictions |
Max LOA |
No restrictions |
Nr of berth |
3 |
Discharging rate |
Petcoke 5.000 mt per day |
Loading rate |
Clinker 6.000 mt per day
Cement in bulk 2 .500 mt per day
Cement in bags 1 .500 mt per day |
Remark:
There are three cranes available. One with SWL 8 tons and the others
two with SWL 3.2 tons. Above loading/discharging rates are based
on vessels self-load/discharge
Note: "All details above, subject to confirmation"
|