| PRAIA
MOLE: STEEL TERMINAL
Cargo handling |
To load Steel Products, granite;
To discharge rails, locomotives; |
Port Position |
Lat 20 17S Long 40 14W |
Max arrival
draft |
13.50 m + tide, limited to 13.80 m |
Max air draft |
draft of 14,5 mtrs is acceptable |
Max BEAM |
|
Max LOA |
berth 1 - 214,5 m
berth 2 - 201,1 m
berth 3 - 222,5 m |
Max DWT |
Panamax or handsize, always subject to terminal approval |
Loading rate |
5 shore cranes with capacity of 40mt and 3 with capacity of 25mt.
Loading rate of 1500 tons/h p/gang for steel slabs.
Loading rate of 10-12.000 tons p/day for steel slabs. For
coils we can consider 18hrs for
loading of 10.000 MT |
Min hatch size accepted |
The Loa of Praia Mole (Steel Terminal) is 668 meters
(from berth 1 to berth 3) with safe distance of 10 meters
between vessels.
|
Max sailing
draft |
13,50 m |
Nr of berths |
03 |
Note:
"All details above, subject to confirmation"
|