Cargo Handling |
Steel Products Loading / Discharging |
No.of berths |
03 berths available 301, 302 and 303 |
Max Arrival Draft |
13.50 meters at shed 301
14.30 meters at sheds 302 and 303 |
Max Air Draft |
No restriction at all once, dischops will be
performed by ships crane |
Max Beam |
No restriction at all once, dischops will be
performed by ships crane |
Max quaylenght |
810 meters |
Max
LOA |
No restriction at all once, dischops will be
performed by ships crane |
Water Density |
1.021 upto 1.025 at both piers |
Average Discharging Rate |
6000 upto 9000 mt/day, bss 3 gangs working round oclock. |
Shore facilities |
2 porteiners + 2 mobile harbor cranes used
for loadops/dischops at sheds 302
/ 303.
Ships cranes at shed 301 |
Helpful Info |
Vsls characteristics must be
sent to terminal in advance to obtain their official approval
thru the official fixing channel. |